Approvals & Standards – Are They End Game or Path Markers?

Please follow and like us:

“I’ve been installing liners for a while now and ran into an engineer who insists I provide all documentation showing that the material have approvals from an independent agency for the resin and tube to the thickness specified for his job. Do you have testing samples approved for 3mm as well as 4.5mm and with each of the hardeners you supply? According to him I need documentation for the Quik-Pox 15 at 3mm x 4”, 4.5mm x 4”, 3mm x 6” and 4.5mm x 6”.  Additionally, I need documentation for the Quik-Pox 30 with the same sizes, as well as the Quik-Pox 60. Do you have that documentation?”

Testing
Whoa! Let’s back up a minute. First things first. The main document that covers our process is ASTM F-1216 for the inversion method and ASTM F-1743 for the pull in place method. That document describes how to install the materials as well as how to determine thickness. That document also outlines the ANSI standards used to test materials. Further reading of these standards shows the method used to test the material and uses results for the material across all design thicknesses. There is no provision for testing each resin model nor is there any provision for testing the finished material at different thicknesses.

The main document that covers our process is ASTM F-1216 for the inversion method and ASTM F-1743 for the pull in place method.

Here’s what becomes confusing to many folks in the industry with regard to this process. While we manufacture the raw materials for preparation of the finished product, the final assembly or manufacture is in the hands of the installer. The installer is charged with the duties of properly measuring, mixing, saturating the tube and calibrating the thickness to meet the design all in the field. Since we have two parties involved in the finished product we can test the components in the laboratory, but those results may vary widely from what is found in the field. Here’s an example of why; we manufacture pure resin and test the resin for strength prior to “wetting out” material. Our resin is then cured and tested without tube and the results are published showing a flexural modulus in excess of 400,000 psi. When tube is added to the mix, the flexural modulus takes up space in the resin but contains no strength what so ever. This reduces the value of the resin in its natural state to less than the 400,000 psi we had before adding felt tube. Here’s where the ASTM comes into play. You will note that the minimum value of flexural modulus strength is 250,000 psi, so resin producers that supply resin with a flexural modulus of 370,000psi neat, will most likely meet the 250,000psi minimum strength.

The bottom line is this, if you are going to build to a standard, the only way you can determine that you’ve met the standard is to test the finished product. Most often this is accomplished by capturing a restrained sample by placing a 12” piece of the same sized pipe as is being lined, curing it with the liner, then submitting the sample piece to an independent lab for testing. Depending on the lab and the quantities of samples tested each one may cost between $500 and $1000 to insure that the standard is met. The question comes about as to who will pay for this?

Mixing Resin

Mixing Resin
While we don’t see much interest from home owners for the added expense of testing, when you move into the public arena and engineering firms get involved, you can pretty much be assured that they will look for assurances that what you install will meet the specification they are going for.

Calibrating Tube Thickness

If you need more documentation or in depth information contact us at +1-888-354-6464 or info@pipeliningsupply.com.


Pipe Lining Supply Events!

  • Don’t forget our FREE giveaway!!  you can win a 100′ cable and a chain knocker.  Just click here to register to win.  Drawing is Oct. 15
  • For those still wanting certification training in Springfield, Missouri on October 18, 2018. You will review the ASTM and ANNI standards that pertain to the CIPP lateral lining and the AIPPR pipe coating processes, the life expectancy of the processes, the flow studies, materials and resins used, step by step process to install, frequently asked questions and hands on operation of the equipment. Call our local office at +1-417-719-7172 or write info@pipeliningsupply.com to reserve your spot or more information.
  • Visit us at the inaugural Santa Barbara County Plumbing, Heating and Cooling Industry Expo.  Saturday November 3, 2018 from 9am-3pm at the Santa Maria Fairpark

Cleaning Tools and Machines

High Speed Cables, Chain Knockers, Sanding Devices & Paper, and cutters stocked at all Pipe Lining Supply’s locations. If you need replacements, as well as our full line of Renssi machines for drain cleaning and lateral reinstatements, call us today at +1-888-354-6464 or info@pipeliningsupply.com.