Trenchless

Press Release: Product Improvement

Press Release: Product Improvement

Pipe Lining Supply’s Introduction to a MAJOR PRODUCT Improvement – New Nozzle  with the Quik-Shot™ System January 2019 – Pipe Lining Supply is launching their new line of nozzles for the Quik-Shot™ System. The new nozzles improve the inversion process by reducing friction at the nozzle head. This change will allow the liner to invert easier than […]

Read More →

Tracking – Does It Damage Your CIPP Project?

Tracking – Does It Damage Your CIPP Project?

“We installed a CIPP liner awhile back on a vertical plumbing stack about 2 months ago. We got a call that a damaged pipe in the lower lever mechanical room was leaking sewage into the room. This was in a 3 story apartment building and this stack had a cracked pipe in the mechanical room […]

Read More →

Quik-Coating Resin Mixing

Quik-Coating Resin Mixing

“A competitor told me that your coating system can’t work as it does not employ a static mixer to mix the 2 parts of resin. He also said there would be no reason to weigh the resin before application and after as the resin is pre-mixed before applying. Do you have an answer or is […]

Read More →

Approvals & Standards – Are They End Game or Path Markers?

Approvals & Standards – Are They End Game or Path Markers?

“I’ve been installing liners for a while now and ran into an engineer who insists I provide all documentation showing that the material have approvals from an independent agency for the resin and tube to the thickness specified for his job. Do you have testing samples approved for 3mm as well as 4.5mm and with […]

Read More →

What’s the Best Vehicle to Use for your JOB??

What’s the Best Vehicle to Use for your JOB??

The 4 Vehicles above are the most common vehicles used to perform field installation of CIPP lateral lines. That said, any vehicle that gets you to the field, with all of the materials and equipment you need to perform the job, and return again, are acceptable vehicles. So, why would you choose one over the […]

Read More →

Updates on the Quik-Coating Process

Updates on the Quik-Coating Process

As Described In AIPPR IGC-351-18 With our Quik Coating process that launched in December of this past year, we’ve armed many new and existing customers with a tool in their toolbox to rehabilitate drain, waste and vent pipe. Many have embraced the technology and have grown their businesses with the process adding multiple units to […]

Read More →

Top
close

Enjoy this blog? Please like us on Facebook!!